- This morning I went to bing.com and saw the above picture at that website and wondered what I was looking at. When I looked for the description to the right lower part of the screen there under (info) I realized this was a barrier like a locke to prevent high tides from inundating London like it did in 1953 which caused this tidal barrier to be built.
The Thames Barrier at London, England
When unusually high tides on the North Sea cause the River Thames to rise, the Thames Barrier, made up of 10 steel gates, prevents it from flooding London. Spanning 520 meters across the river, it is one of the largest movable flood barriers in the world. The deadly North Sea flood of 1953 prompted the construction of the barrier, which was opened in 1984. Thames Barrier - Wikipedia
-
Thames Barrier
Thames Barrier Close-up of the barrier gates, which are closed when a flood warning is issuedCountry United Kingdom Location London Coordinates Coordinates: 51.4977°N 0.0367°E Purpose anti-flood Status Operational Construction began 1974 Opening date 1984 Construction cost £534 million Built by Costain
Hollandsche Beton Maatschappij
Tarmac ConstructionOperator(s) Greater London Council Dam and spillways Type of dam Steel dam Impounds River Thames Height (thalweg) 20.1 meters Length 520 meters Operator(s) Environment Agency Turbines 0 Website
the-thames-barrier
The report of Sir Hermann Bondi on the North Sea flood of 1953 affecting parts of the Thames Estuary and parts of London[1] was instrumental in the building of the barrier.[2]
Contents
History
Design and construction
In addition to the barrier, the flood defences for 11 miles down river were raised and strengthened. The barrier was officially opened on 8 May 1984 by Queen Elizabeth II. Total construction cost was around £534 million (£1.6 billion at 2016 prices) with an additional £100 million for river defences.
Built across a 520-metre (570 yd) wide stretch of the river, the barrier divides the river into four 61-metre (200 ft) and two, approximately 30 metre (100 ft) navigable spans. There are also four smaller non-navigable channels between nine concrete piers and two abutments. The flood gates across the openings are circular segments in cross section, and they operate by rotating, raised to allow "underspill" to allow operators to control upstream levels and a complete 180 degree rotation for maintenance. All the gates are hollow and made of steel up to 40 millimetres (1.6 in) thick. The gates are filled with water when submerged and empty as they emerge from the river. The four large central gates are 20.1 metres (66 ft) high and weigh 3,700 tonnes.[6] Four radial gates by the riverbanks, also about 30 metres (100 ft) wide, can be lowered. These gate openings, unlike the main six, are non-navigable.
Predictions for operation
A Thames Barrier flood defence closure is triggered when a combination of high tides forecast in the North Sea and high river flows at the tidal limit at Teddington weir indicate that water levels would exceed 4.87 metres (16.0 ft) in central London. Though Teddington marks the Normal Tidal Limit, in periods of very high fluvial flow the tidal influence can be seen as far upstream as East Molesey on the Thames.[7]
Barrier closures and incidents
Season
(Sep–Apr)Closures per season From tidal flooding From fluvial flooding Total[8] 1982–83 1 0 1 1983–84 0 0 0 1984–85 0 0 0 1985–86 0 1 1 1986–87 1 0 1 1987–88 0 0 0 1988–89 1 0 1 1989–90 1 3 4 1990–91 2 0 2 1991–92 0 0 0 1992–93 4 0 4 1993–94 3 4 7 1994–95 2 2 4 1995–96 4 0 4 1996–97 1 0 1 1997–98 1 0 1 1998–99 2 0 2 1999–00 3 3 6 2000–01 16 8 24 2001–02 3 1 4 2002–03 8 12 20 2003–04 1 0 1 2004–05 4 0 4 2005–06 3 0 3 2006–07 8 0 8 2007–08 6 0 6 2008–09 1 4 5 2009–10 2 3 5 2010–11 0 0 0 2011–12 0 0 0 2012–13 0 5 5 2013–14 9 41 50 2014–15 1 0 1 2015–16 1 0 1 2016–17 2 0 2 2017–18 1 0 1
On 20 August 1989, hours after the Marchioness disaster, the barrier was closed against a spring tide for 16 hours "to assist the diving and salvage operations".[11]
The barrier has survived 15 boat collisions without serious damage.[12]
On 27 October 1997, the barrier was damaged when the dredger MV Sand Kite, operating in thick fog, hit one of the Thames Barrier's piers. As the ship started to sink she dumped her 3,300 tonne load of aggregate, finally sinking by the bow on top of one of the barrier's gates where she lay for several days. Initially the gate could not be closed as it was covered in a thick layer of gravel. A longer term problem was the premature loss of paint on the flat side of the gate caused by abrasion. The vessel was refloated in mid-November 1997.[13]
The annual full test closure in 2012 was scheduled for 3 June to coincide with the Thames pageant celebrating Queen Elizabeth II's Diamond Jubilee. Flood risk manager Andy Batchelor said the pageant gave the Environment Agency "a unique opportunity to test its design for a longer period than we would normally be able to", and that the more stable tidal conditions in central London that resulted would help the vessels taking part.[14]
Ownership and operating authority
The barrier was originally commissioned by the Greater London Council under the guidance of Ray Horner. After the 1986 abolition of the GLC it was operated successively by Thames Water Authority and then the National Rivers Authority until April 1996 when it passed to the Environment Agency.
Future
The barrier was originally designed to protect London against a very high flood level (with an estimated return period of one hundred years) up to the year 2030, after which the protection would decrease, while remaining within acceptable limits.[15] At the time of its construction, the barrier was expected to be used 2–3 times per year. It is now being used 6–7 times per year.[16]
This defence level included long-term changes in sea and land levels as understood at that time (c. 1970). Despite global warming and a consequently greater predicted rate of sea level rise, recent analysis extended the working life of the barrier until around 2060–2070. From 1982 until 19 March 2007, the barrier was raised one hundred times to prevent flooding. It is also raised monthly for testing,[17] with a full test closure over high tide once a year.[14]
Released in 2005, a study by four academics contained a proposal to supersede the Thames Barrier with a more ambitious 16 km (10 mi) long barrier across the Thames Estuary from Sheerness in Kent to Southend in Essex.[18]
In November 2011, a new Thames Barrier, further downstream at Lower Hope between East Tilbury in Essex and Cliffe in Kent, was proposed as part of the Thames Hub integrated infrastructure vision. The barrier would incorporate hydropower turbines to generate renewable energy and include road and rail tunnels, providing connections from Essex to a major new hub airport on the Isle of Grain.[19]
In January 2013, in a letter to The Times, a former member of the Thames Barrier Project Management Team, Dr Richard Bloore, stated that the flood barrier was not designed with increased storminess and sea level rises in mind, and called for a new barrier to be looked into immediately.[20][21] The Environment Agency responded that it does not plan to replace the Thames Barrier before 2070,[22] as the barrier was designed with an allowance for sea level rise of 8 mm per year until 2030, which has not been realised in the intervening years.[23] The Thames Barrier is around halfway through its designed lifespan. It was completed in 1982 and was designed to protect London from flooding until 2030 and beyond. The standard of protection it provides will gradually decline over time after 2030, from a 1 in 1000 year event. The Environment Agency are examining the Thames Barrier for its potential design life under climate change, with early indications being that subject to appropriate modification, the Thames Barrier will be capable of providing continued protection to London against rising sea levels until at least 2070.[12][23]
In popular culture
- The 1986 rock music video for "Cross That Bridge" by UK Band "The Ward Brothers" was filmed both inside & outside Thames Barrier #1.[24]
- In the 1982 Alexei Sayle track "'Ullo John! Gotta New Motor?" the barrier is mentioned in the lyrics, "He works on the Thames barrier – he works on the Thames barrier!"
- The climax of Lois McMaster Bujolds 1989 novel Brothers in Arms takes place in and near the Thames Barrier.
- In series 5 episode 7 (1992) of firefighting drama London’s Burning, Blue Watch are called to the Thames Barrier to rescue a maintenance worker.
- In the tenth episode of Series 5 of Spooks, broadcast in mid-late-2006 an environmental group threatens to blow up the Thames Barrier.
- The Thames Barrier appears in the 2006 Doctor Who Christmas special, "The Runaway Bride". The Doctor and his companion Donna Noble emerge from the barrier after defeating the Empress of the Racnoss and her children by flooding her secret underground lair, only to find out that they have accidentally drained the Thames.
- In 2007 in season 10, episode 5 of Top Gear co-host Jeremy Clarkson drives a racing boat through the Thames Barrier while racing James May, Richard Hammond, and The Stig to London City Airport.
- The barrier features as one of the main locations of Flood, a 2007 British disaster film, directed by Tony Mitchell It features Robert Carlyle, Jessalyn Gilsig, David Suchet and Tom Courtenay. It is based on the 2002 novel of the same name by Richard Doyle.[25]
- The barrier features near the end of the music video for Take That's 2010 hit single, "The Flood".
Gallery
See also
- Barrier Gardens Pier
- Delta Works with the Oosterscheldekering
- Floodgate
- MOSE Project
- Saint Petersburg Dam Flood Prevention Facility Complex
References
- Phase 9 Entertainment, "Flood" production details Archived 9 March 2013 at the Wayback Machine.. Retrieved 11 January 2011
Further reading
- Stuart Gilbert and Ray Horner. The Thames Barrier Telford 1984 ISBN 0-7277-0249-1
- S Gilbert. The Thames Barrier. Thomas Telford Ltd. 30 June 1986. 216 pages. ISBN 0-7277-0249-1.
- Ken Wilson. The Story of the Thames Barrier. Lanthorn. 1984. 32 pages. ISBN 0-947987-05-3.
External links
Wikimedia Commons has media related to Thames Barrier. |
- Thames Barrier page at the Environment Agency
- Animation showing how the Barrier works
- "Time-lapse video showing Thames Barrier operating in flood conditions". Daily Telegraph. 5 January 2014.
- Streetmap of Thames Barrier
- Thames Barrier Information and Learning Centre – on south side of the Thames
- Thames Barrier Park – park by the Barrier on north side of the Thames
- Londons flood defence system
- Map of associated flood barriers
- Risques VS Fictions n°8, filmed interview (subtitled in French) with Steve East, technical support team leader of the real barrier about the depiction of the barrier and scientific accuracy of Flood.
Categories:
- Buildings and structures completed in 1984
- Buildings and structures in the Royal Borough of Greenwich
- Buildings and structures in the London Borough of Newham
- Charlton, London
- Coastal construction
- Flood barriers
- Flood control in the United Kingdom
- Geography of the River Thames
- Infrastructure in London
- Port of London
- Tourist attractions in the Royal Borough of Greenwich
- Tourist attractions in the London Borough of Newham
No comments:
Post a Comment