Water supply and sanitation in Saudi Arabia
From Wikipedia, the free encyclopedia
This article was written in 2007 and has last been partially
updated in August 2013. However, some sections of the article may be out
of date, for example if the data and information found in sources are
from an older date.
Saudi Arabia: Water and Sanitation |
|
Data |
Water coverage (narrow definition) |
97% in urban areas (1993) [1] |
Sanitation coverage |
n/a |
Continuity of supply (%) |
n/a |
Average urban water use (liter/capita/day) |
235 [2] |
Average urban water tariff (US$/m3) |
0.08 |
Share of household metering |
Low |
Annual investment in water supply and sanitation |
US$ 200/capita and year (Estimated needs for 2002-2022) [2] |
Investment financing |
Mostly through government subsidies |
Institutions |
Decentralization |
No |
National water and sanitation company |
National Water Company (NWC) |
Water and sanitation regulator |
None |
Responsibility for policy setting |
Ministry of Water and Electricity (MOWE) |
Sector law |
No |
Number of service providers |
One (National Water Company) with management contracts for specific cities |
Water supply and sanitation in Saudi Arabia is characterized by significant investments in
seawater desalination,
water distribution, sewerage and wastewater treatment leading to a
substantial increase in access to drinking water and sanitation over the
past decades. About 50% of drinking water comes from desalination, 40%
from the mining of non-renewable groundwater and 10% from surface water,
especially in the mountainous South-West of the country. The capital
Riyadh, located in the heart of the country, is supplied with desalinated water pumped from the
Persian Gulf over a distance of 467 km. Given the substantial
oil wealth,
water is provided almost for free. Despite improvements service quality
remains poor. For example, in Riyadh water was available only once
every 2.5 days in 2011, while in Jeddah it is available only every 9
days.
[3] Institutional capacity and
governance
in the sector are weak, reflecting general characteristics of the
public sector in Saudi Arabia. Since 2000, the government has
increasingly relied on the private sector to operate water and
sanitation infrastructure, beginning with desalination and wastewater
treatment plants. Since 2008, the operation of urban water distribution
systems is being gradually delegated to private companies as well.
Access
Old water tower in Riyadh
There are no reliable and up-to-date data on access to drinking
water supply and
sanitation in
Saudi Arabia.
According to the
WHO,
the latest reliable source is the 1993 census. It indicates that in
urban areas, where 88% of the population lives, 97% had access to
drinking water from house connections and 100% had access to improved
sanitation. Urban sanitation was primarily through on-site solutions and
only 43% of the urban population was connected to sewers. In rural
areas, however, only 63% had access to an improved source of water
supply. There are no reliable figures on access to sanitation in rural
areas.
[1]
However, according to a 2004 study of Elie Elhadj from the School of
Oriental and African Studies “one half of Saudi householders still have
no municipal water connections and two thirds are without sanitation
connections”. Also, Saudi cities have no rainwater drainage systems to
deal with the brief and occasional, but severe deluges of winters.
[4]
Service quality
Drinking water. Despite clear improvements the quality of
service remains insufficient. For example, few cities enjoy continued
service, and water pressure is often inadequate. In Riyadh water was
available only once every 2.5 days in 2011, while in Jeddah it is
available only every 9 days. This is still better than in 2008, when the
respective figures were 5 and 23 days.
[3]
While systematic data on service quality are now available for several
cities, they are not publicly available. In some localities groundwater
used for drinking water supply is naturally contaminated with levels of
fluoride
in excess of the recommended level of 0.7 to 1.2 mg/l. For example, a
1990 study showed that the fluoride level in drinking water in Mecca was
2.5 mg/l.
[5] In Riyadh the level of fluoride is reduced far below the recommended level by blending groundwater with desalinated seawater.
[6]
Wastewater. There are 33 wastewater treatment plants with a
capacity of 748 million cubic meters per year, and 15 more are under
construction. Much of the treated wastewater is being
reused to water green spaces in the cities (landscaping), for
irrigation in agriculture and other uses.
Concentrated sewage from septic tanks is collected through trucks. In
Jeddah the trucks dumped sewage for 25 years in a valley that was
euphemistically called the "Musk Lake". The pond, holding more than 50
million cubic meters of sewage, almost overflowed during heavy rains in
November 2009 threatening to flood parts of the city. After that, the
King ordered the lake to be dried up within a year with the help of the
National Water Company.
[7]
Water use
Total municipal water use in Saudi Arabia has been estimated at 2.1
cubic kilometers per year in 2004, or 9% of total water use. Agriculture
accounts for 88% of water use and industry for only 3%. Demand has been
growing at the rate of 4.3% per annum (average for the period
1999-2004), in tandem with urban population growth (around 3%). Water
supply is usually not
metered,
neither at the source nor the distribution point. It is tentatively
estimated that average water consumption for those connected to the
network is about 235 liters per capita per day, a level lower than in
the
United States.
[2]
Water reuse in Saudi Arabia is growing, both at the level of buildings and at the level of cities. For example,
ablution water in mosques is being reused for the flushing of toilets.
[8] At the city level, treated
wastewater
is being reused for landscaping, irrigation and in industries such as
refining. In Riyadh 50 million cubic meter per year is pumped over 40 km
(25 mi) and 60m elevation to irrigate 15,000 hectares of wheat, fodder,
orchards and palm trees.
[9]
Water conservation measures, such as awareness campaigns
through the media and educational pamphlets, have been carried out. In
addition, in Riyadh a leakage control program has been carried out and a
special, higher water tariff has been introduced. Furthermore free
water appliances (taps, shower heads, toilet boxes) were distributed,
reportedly resulting in a decrease of residential water use of between
25-35%.
[10]
An unknown, but large proportion of the population is dependent on supply through
water tankers.
For example, Riyadh experiences water shortages and intermittent
supply, especially during the summer peak demand. To cope with the
shortage, 18 million cubic meters of water was distributed during one
summer by private contractors. With the commissioning of a new large
well field at Al Honai this problem has been reduced.
[10]
Water resources
Saudi Arabia is one of the driest regions in the world, with no perennial rivers. Water is obtained from four distinct sources:
Only the last two sources are renewable. Their volume, however, is
minimal. Desalination plants provide about half the country’s drinking
water. About 40% comes from groundwater. The remainder comes from
surface water (about 10%). Desalinated water is prevalent along the
coasts, surface water in the southwest region and groundwater elsewhere.
The capital
Riyadh,
however, is supplied to a great extent with desalinated water pumped
from the Persian Gulf over 467 km to the city located in the heart of
the country.
Fossil groundwater
Current levels of groundwater extraction far exceed the level of
natural recharge: Groundwater is being “mined”. For example, the
Al-Ahsa
aquifer in the Eastern Province experienced a drop of 150 meters over
the past 25 years. Since the usable volume of the aquifers is not known,
it is not clear how long groundwater mining can be sustained. Estimates
of the groundwater stored in the principal aquifers are controversial.
Ongoing resource assessments are expected to provide reliable estimates
of the volume of water left in storage in each aquifer, and estimates of
the portion of that volume that can be extracted on a sustainable
basis.
Desalination
In 2011 the volume of water supplied by the country’s 27
government-operated desalination plants at 17 locations was 3.3 million
m3/day (1.2 billion m3/year). 6 plants are located on the East Coast and
21 plants on the Red Sea Coast. Saudi Arabia is the largest producer of
desalinated water in the world. 12 plants use
multi-stage flash distillation (MSF) and 7 plants use
multi-effect distillation
(MED). In both cases the desalination plants are integrated with power
plants (dual-purpose plants), using steam from the power plants as a
source of energy. 8 plants are single-purpose plants that use
reverse osmosis (RO) technology and power from the grid. By far the largest plant,
Jubail
II on the East Coast, is a MSF plant built in subsequent stages since
1983 with a capacity of almost 950,000 m3/day that supplies Riyadh. The
largest RO plant is located in Yanbu on the Red Sea. It supplies the
city of
Medina
and has a capacity of 128,000 m3/day. The MED plants are much smaller.
Mekka receives its water from plants in Jeddah and Shoaiba just south of
Jeddah. In Ras al Khair, the largest plant of the country with a
capacity of 1 million m3/day was under construction as of 2012.
[11]
The first solar-powered desalination plant was due to open in 2013 in
Al Khafji near the Kuwaiti border. It has a capacity of 30,000 m3/day. A
ten times larger plant at a hitherto undisclosed location is due to be
launched once the first plant has been commissioned as part of a
national plan to massively expand solar desalination launched in 2010
called the King Abdullah Initiative for Solar Water Desalination.
[12]
In 2010 the largest floating desalination plant in the world with a
production capacity of 25,000 m3/day (9 million m3/year) was launched on
a barge in
Yanbu.
While this capacity is just a small fraction of total installed
desalination capacity, it is sufficient to supply a city with more than
100,000 inhabitants with drinking water. Just like smaller desalination
barges that operate since 2008 they are designed to meet high seasonal
demand for potable water anywhere along the Red Sea coast of the
Kingdom.
[13]
Surface water and alluvial aquifers
The country’s mean annual surface runoff has been estimated at more
than 2 billion cubic meters per year. The country has eleven renewable
alluvial aquifers with an estimated combined mean annual recharge of
nearly 1 billion cubic meters per year. According to the World Resources
Institute the renewable groundwater and surface water resources
overlap, i.e. the entire renewable groundwater resources originate in
recharge from rivers (
Wadis) so that total renewable water resources are in the order of 2 cubic kilometres/year.
[14] Surface resources and renewable aquifers are concentrated in the west and southwest, where rainfall is higher.
History and recent developments
The Saudi water sector, like the entire country, has undergone
tremendous changes over the past decades from a system based on the use
of local renewable water resources for small-scale irrigation and
limited domestic uses to a system largely based on the use of
desalinated water and fossil groundwater for large-scale irrigation and
domestic, commercial and industrial uses at a level comparable to
developed countries. The Saline Water Conversion Corporation, created in
1965, has been an important player in this process of change.
Until 1994 domestic water use was entirely free in Saudi Arabia. Only
then a very moderate tariff has been introduced. In the early 2000s the
government decided to involve the private sector not only in the
construction of infrastructure, but to expand its role also to the
financing and operation of infrastructure through Build-Operate-Transfer
(BOT) projects. The first BOT project in the water sector was a
wastewater treatment plant in Jeddah, followed by Independent Water and
Power Projects (IWPPs) for integrated power and desalination plants.
In 2003 the Ministry of Water and Energy was created. It took over
the water resources management function from the Ministry of
Agricultural and Water and the responsibility for water supply and
sanitation from the Ministry of Municipal and Rural Affairs. In the same
year the Water & Electricity Company was created as an off-taker
for water and electricity produced by the IWPPs.
In 2008 the privatization program was expanded to drinking water
supply when the Kingdom's first management contract was signed for the
capital Riyadh, followed by two more management contracts (see below).
Beginning with the expiration of the management contract in Riyadh in
2014, it is planned to award 20 to 30-year lease contracts for the
cities covered by management contracts.
[15]
Responsibility for water supply and sanitation
Until the establishment of the National Water Company (NWC) in 2008
there was no separation between institutions in charge of policy and
regulation on the one hand, and service provision on the other. Instead
all key sector functions were the direct responsibility of a single
Ministry, the Ministry of Water and Electricity.
The quality and efficiency of service provision are hampered by the
many weaknesses afflicting the public sector in Saudi Arabia in general.
These include an inadequate civil servants recruitment policy,
insufficient salaries, limited skills, no
accountability for action taken (or not taken), a lack of strategic planning, and ad-hoc investment decisions.
Policy and regulation
Since 2003 the Ministry of Water and Electricity (MOWE) is
responsible for policy and regulation of water and sanitation services.
There is no separate regulatory agency for the sector. The recently
established Electricity and Co-generation Regulatory Authority (ECRA)
only regulates privately owned desalination plants. The functions of the
Ministry of Agriculture overlap with those of MOWE, since agriculture
is by far the main water user in the country and contributes in the
depletion of fossil aquifers on which a large share of the country’s
drinking water supply depends. There is also some overlap between the
two Ministries in the area of wastewater reuse. There is no Ministry of
Environment in Saudi Arabia.
Service provision
The responsibility for service provision is shared by the private and
public sectors. The National Water Company (NWC) is in charge of water
supply and sanitation in the largest cities -
Riyadh,
Jeddah,
Mecca and
Taif
as of 2013 in partnership with foreign private operators. In other
cities water supply and sanitation is still the direct responsibility of
MOWE through its regional directorates and branches. Local government,
which is in charge of service provision in many other countries, has no
role in service provision in Saudi Arabia.
Desalination plants are run by the Saline Water Conversion
Corporation (SWCC) or by private companies called Independent Water and
Power Projects (IWPPs) which sell water and energy to a public entity
called the Water & Energy Company. Many wastewater treatment plants
are run by private companies under
BOT contracts.
The National Water Company and management contracts
The National Water Company (NWC) plans to become a "leading water
utility in the region" within 4 to 7 years after its creation in 2008.
NWC's twelve-member Board is chaired by the Minister of Water and
Electrity and includes the CEO of the company.
[16]
NWC contracts out water distribution services for individual cities
to the private sector under management contracts. Key objectives include
improving service quality, operational efficiency and customer
satisfaction. The contracts are preceded by one-year technical
assistance contracts. This is followed by a further 1-2 year validation
period during which the baseline and target data for key
performance indicators are being reviewed.
[17]
Tariff levels will not be affected. The scope of the contracts includes
training and qualifying Saudi nationals, as well as research and
development with the aim to transfer technology.
[18]
The three contracts signed so far are:
- In April 2008 for the capital for Riyadh with the French firm Veolia, covering six years and valued at $60m,
- A seven-year contract with the French firm SUEZ for Jeddah,
- In June 2010 for Mecca and Taif with the French firm SAUR, covering five years and valued at $46m.
As required by Saudi law SAUR's team working in Mecca consists
entirely of Muslims. Further management contracts are expected to be
tendered for
Medina and Greater
Dammam.
[19]
NWC says that between its creation in 2008 and 2012 it has saved
115.4 million m3 of water through leak reduction, improved water quality
compliance from 82% to 98.7%, increased customer satisfaction from 45%
to 83%, reduced the number of projects that are behind schedule from 104
to 3, and has improved its annual cash collection from SAR561 million
($149 million) to SAR1,119 million ($298 million).
[20]
NWC also plans and oversees infrastructure projects such as the SAR
1.6 billion ($426 million) Riyadh Water Supply Programme completed in
2013 that included drilling 43 new wells and building 27 brackish water
desalination plants.
[20]
NWC had initially been expected to take over
Medina in 2011, as well as
Damman and
Al-Khobar in 2013.
[21]
The Saline Water Conversion Corporation
The Saline Water Conversion Corporation (SWCC), an entity under the
authority of the Ministry, is in charge of operating the country’s
publicly owned desalination plants, and operating a network of water
transmission pipelines 4,300 kilometres (2,700 mi) to transport the
water in bulk from the plants to the major consumption centers, some of
them located far inland such as
Riyadh.
SWCC is the biggest water desalination entity in the world. It has more
than 3.3 million m3/day water installed capacity, and its plants are
designed to reliably provide more than 2.8 million m3/day.
SWCC is not an independent company run on commercial principles, but
rather a branch of the government. Its water is provided for free to the
branches of MOWE and to NWC. SWCC has a research department and a
training center. In 2008 the government announced plans to "privatize"
SWCC by transforming it in a holding company. The holding company would
initially supervise affiliated production firms that would run the
desalination plants. Subsequently it would sell off the firms and
include the private sector in a way similar to what has been done with
the Independent Water and Power Projects (see below). The first plant to
be privatized would be in
Yanbu.
[22]
However, the plants have subsequently been modified: The Yanbu 1 and 2
plants will continue to be operated by SWCC, and the Yanbu plant will be
built by a private company, but operated by SWCC.
[23]
Independent Water and Power Producers for desalination
Since the early 2000s, Saudi Arabia has invited the private sector
not only to build, but also to finance and operate new desalination
plants. A Water and Energy Corporation (WEC) has been established as an
off-taker that buys water from the IWPPs through 20-year power and water
purchase agreements (PWPAs). The government fully guarantees the
payments due from WEC to the IWPPs. This follows the example of the
Persian Gulf countries, which had introduced IWPPs several years
earlier. The first such project was the
Shoaiba III Independent Water and Power Producer (IWPP) completed in 2005.
[24] It is located on the Red Sea and provides water to
Jiddah,
Mecca and
Taif. The second IWPP was the Jubail II project, located next to the Jubail industrial complex on the Persian Gulf coast.
In 2007 Saudi Arabia planned to launch ten further IWPPs by 2016 with
a total investment of $16 billion. The first phase of this plan with an
approximate cost of US$ 7.3 billion, consists of three IWPPs: Shuqaiq
II, Ras Al-Khair and Jubail III.
[25]
Independent Water and Power Producers in Saudi-Arabia
Shoaiba III |
Operational in 2005 |
150? |
1200 |
|
Jubail II |
Operational in 2009 |
292 |
2755 |
|
Shuqaiq II |
Operational in 2010 |
77 |
850 |
|
Ras Al-Khair
(formerly Ras Azzour) |
Contract signed in 2010 |
365 |
2500 |
|
Jubail III |
? |
127 |
1100 |
|
The Water & Energy Company
The Water & Energy Company, created in 2003, is the off-taker for
desalined water produced by privately operated desalination plants. It
is jointly owned by SWCC and the Saudi Electricity Company (SEC).
[26]
Project finance for wastewater treatment plants
Project finance,
i.e. financing secured primarily by the projected revenue stream of the
project, has been commonly used to finance wastewater treatment plants
in Saudi Arabia. In May 2002 the first wastewater contract in Saudi
Arabia financed in this way, in this case as a
BOT
contract, was awarded to a consortium of local firms. The consortium
was to rehabilitate, operate, maintain and upgrade the wastewater system
of the
Jeddah Industrial City over a period of 20 years and invest US$ 32 million.
[27]
The government has awarded many more BOT wastewater treatment contracts
since then, based on the revenue stream of long-term sales agreements
for treated wastewater sold to major customers.
[28]
Efficiency
The operational efficiency of water and sanitation services is
typically measured through the level of non-revenue water and the ratio
of staff per 1,000 connections.
Because of the low level of metering it is difficult to estimate the level of
non-revenue water in Saudi Arabia. Only in the case of
Riyadh, where meters exist, a meaningful estimate has been done, resulting in an estimated 34% of
non-revenue water.
It is broken down into 21% physical losses and 13% commercial losses
from undermetering, illegal connections and authorized unbilled
consumption such as for mosques. In addition, 24% of billed consumption
is not being paid. The overall level is high by international standards.
A recent benchmarking study showed that the regional directorates are
employing 10,500 people to serve 5.7 million customers. This
corresponds to about 10 staff per 1,000 connections, which is more than
three times higher than in the case of efficiently run utilities. The
actual number of people employed in service provision is even higher
because many directorates contract out specific services.
Tariffs and cost recovery
Tariffs. Average
water tariffs
range from US$0.06 to US$0.10/m3, which are among the lowest in the
world. The Kingdom has an increasing block tariff structure, but the
majority of the consumers fall in the first two blocks where water
charges are minimal. Customers with a water use of less than 100 cubic
meter per month pay only 0.1 Riyals/m3 (US$0.03/m3).
[3]
In other countries where increasing-block tariffs are used - such as in
Jordan, Yemen or Tunisia - the lifeline consumption benefiting from a
lower tariff level is typically set at 20 cubic meters per month or
less. The tariff level and structure, combined with a low share of
metering, provide little or no incentive to conserve water. Proposals
for water tariff adjustments have been formulated, most recently through
a study by a Saudi think tank, the Al-Aghar Group in partnership the
Bushnak Academy, presented at the Saudi Water and Power Forum 2010.
[29][30] But so far no decision has been taken.
Prices for water sold by tanker trucks. A cubic meter of water
supplied by a water tanker may cost as much as 6 Riyals (US$ 1.50), or
about 20 times more than water supplied through the network. Citizens
who are not connected to the piped network, who are often poor, pay up
to 40 times more for water than connected households. The monthly water
bill is about 1 Riyal (US$0.27), compared to an average mobile phone
bill of 200 Riyals.
[29]
Sale of treated effluent. Through the Treated Sewage Effluent
Initiative (TSEI) of the National Water Company, treated wastewater is
sold to major water customers, such as industries or golf course
operators, under long-term contracts of up to 25 years. This generates a
revenue stream that recovers the costs of wastewater treatment under
Build-Operate Transfer (BOT) projects financed by the private sector. As
of 2011, it was estimated that NWC had signed TSE agreements worth more
than 5 billion Saudi Riyals (USD 1.33 billion).
[28]
Cost recovery and subsidies. Few – if any – of the regional
branches of MOWE have sufficient revenues to recover costs, despite the
fact that they receive desalinated water for free. For example, the
Riyadh branch – probably one of the best performing branches - had
revenues of 370 million Riyals in 2004, but expenses of 570 million
Riyals. On average, "the government is only recovering one or two
percent of its costs, and the (subsidy) plans are benefiting the rich,
not the poor", according to Adil Bushnak.
[29]
There is no recovery of the cost of wastewater collection and treatment
from those who generate the wastewater. According to a 2000 estimate by
the World Bank, the government paid annual subsidies of US$3.2 billion,
equivalent to 1.7% of GDP and 7% of oil revenues.
[31]
Investment and financing
All investment for water and sanitation, including desalination, is
funded directly by the central government’s budget. The 7th and 8th
Development Plans (covering the periods 2000-2005 and 2006-2010
respectively) allocations for water (including irrigation), covering a
period of ten years, amounted to Saudi Riyal 34.9 billion (US$9.2
billion) and Saudi Riyal 41.6 billion (US$11.1 billion) respectively,
equivalent to US$ 2 billion per year.
It has been estimated that between 1975 and 2000 a total of more than
US$100bn has been invested in water supply and sanitation, and that a
further US$130bn will be needed between 2002 and 2022, corresponding to
US$6.5 billion per year or more than US$200 per capita and year.
[2]
This level of investment in water per capita is among the highest in
the world, higher than in the US, the UK or Germany, due to the high
cost of desalination and the need to transport water over long
distances. It corresponds to about 1.5% of GDP.
See also
References
No comments: